Design for fabrication and erection
Coordinate the steel structure with architectural layouts, civil interfaces and mechanical equipment before fabrication.
- Constructability and engineering coordination
- Project-specific design requirements
Vietnam fabrication support and Malaysian site execution connect engineering, quality control and installation on industrial and commercial projects.

Coordinate the steel structure with architectural layouts, civil interfaces and mechanical equipment before fabrication.
Steel members are fabricated to the package requirements. The profile describes material traceability and welding inspection throughout fabrication.
Project specifications determine painting, galvanising or fireproofing requirements. These treatments form part of the delivery sequence before erection.
Steel frames, trusses and platforms are erected and coordinated with civil, mechanical and electrical works. The Pasir Gudang project illustrates how steel and industrial systems fit together.
Review the mill project